BBlogFlow

Cathedral Village comes alive this week for 35th arts festival - SaskToday.ca

·May 19, 2026
Source: SaskToday.ca
Read the original article

This story deserves to be shared

Send it to someone who'd care, or post it on your networks.

Facebook Twitter Email

This article is an excerpt. To read the full content, visit the original source. SaskToday.ca

Reactions

0 comments

No comments yet. Be the first to share your thoughts!

Facebook Twitter

Related articles

Archdiocese of Chicago holds Sunday Mass at Holy Name Cathedral

24/7 LiveChicago & Suburban Cook Co. North SuburbsWest SuburbsSouth SuburbsNW Indiana ChurchMass from Holy Name Cathedral airs on ABC7 and streams on ABC7Chicago.com at 9:30 a.m. on Sundays. ByABC 7 Chicago Digital Team Sunday, October 18, 2026 3:00PMCHICAGO (WLS) -- The Archdiocese of Chicago broadcasts Sunday Mass from Holy Name Cathedral on ABC7. Mass from Holy Name Cathedral airs on ABC7 and streams on ABC7Chicago.com at 9:30 a.m. on Sundays. ABC7 Chicago is now streaming 24/7. Click here to watch<Top StoriesEvanston HS marching band reportedly faced racist, homophobic comments during game at New Ryan Field3 hours ago4 injured, 1 critically, in drive-by shooting in South Austin parking lot near Loretto Hospital: CPDAfter being struck by lightning, Chicago woman performs CPR twice to save boyfriend/center>Report a correction or typoCopyright © 2026 WLS-TV. All Rights Reserved.

United States·ABC7 Chicago·

mirrored acrylic skin dissolves cube pavilion into its surroundings in mexico

MIRROR-FINISH ACRYLIC PANELS CONCEAL pavilion IN GUADALAJARADesigned by errre taller, Sfumato is a temporary reflective pavilion that reinterprets the Cubo MEM, a prominent sculptural landmark at the ITESO architecture complex in Guadalajara, Mexico. Selected as the winning proposal for the inaugural Pabellón MEM competition, the project investigates how an existing architectural structure can become visually imperceptible while maintaining its physical footprint.all images ©errre tallerCONCEALED STEEL FRAMING FORMS MONOLITHIC SKYWARD PAVILIONThe intervention by studio errre taller wraps the 6.40 × 6.40-meter cube in a reflective envelope composed of 3 mm mirror-finish acrylic panels. The standard 1.22 × 2.44-meter sheets are combined with 76 cm cut sections to maximize material efficiency while maintaining surface continuity. The panels are attached using double-sided tape and silicone to a light-gauge metal stud-and-track framing system supported by an interior wooden sub-structure fixed to the original PTR steel frame. To preserve the illusion of a monolithic volume, a single access portal is positioned discreetly on the less prominent west face.

designboom·