BBlogFlow

A 672-megawatt dam in Canada runs six turbines set in concrete that has been swelling from the inside for about 40 years, up to a fifth of an inch a year, knocking their shafts out of plumb, so engineers keep sawing slots through it with diamond wire - Autonocion.com

·2d ago
Source: Autonocion.com
Read the original article

This story deserves to be shared

Send it to someone who'd care, or post it on your networks.

Facebook Twitter Email
Photo credit : Mactaquac Generating Station NB Power

Susan Holt, the premier of New Brunswick, says the Mactaquac Generating Station often gets called “the battery of the Maritimes.”

But if you’ve ever found an old phone in a drawer with its case bulging open, you might hear that nickname a little differently… Because this battery’s been swelling for about 40 years.

This article is an excerpt. To read the full content, visit the original source. Autonocion.com

Reactions

0 comments

No comments yet. Be the first to share your thoughts!

Facebook Twitter

Related articles

When engineers become business owners - Control Design

Mike Bacidore is chief editor of Control Design and has been an integral part of the Endeavor Business Media editorial team since 2007. Previously, he was editorial director at Hughes Communications and a portfolio manager of the human resources and labor law areas at Wolters Kluwer. Bacidore holds a BA from the University of Illinois and an MBA from Lake Forest Graduate School of Management. He is an award-winning columnist, earning multiple regional and national awards from the American Society of Business Publication Editors. He may be reached at [email protected]

Control Design·